167 results
6-K
EX-99.2
HBM
Hudbay Minerals Inc.
14 May 24
Unaudited Condensed Consolidated Interim Financial Statements
4:59pm
the quality of ore production and minimize waste dilution. There remains another 1.4 million ounces of gold in inferred resources in Snow Lake … Strip ratio is calculated as waste mined divided by ore mined.
3 Reflects combined mine, mill and general and administrative ("G&A") costs per tonne
6-K
EX-99.3
HBM
Hudbay Minerals Inc.
14 May 24
Unaudited Condensed Consolidated Interim Financial Statements
4:59pm
information, please see the "Non-IFRS Financial Performance Measures" section of this news release.
4 Strip ratio is calculated as waste mined divided … Operations
Three Months Ended5
Mar. 31, 2024
Dec. 31, 2023
Ore mined1
tonnes
Waste mined
tonnes
Strip ratio2
4.10
Ore milled
tonnes
Copper
0.27
6-K
EX-99.2
HBM
Hudbay Minerals Inc.
12 Apr 24
Hudbay Minerals Inc. Notice of Annual and Special Meeting of Shareholders
3:14pm
") and should follow the instructions provided with such form.
To reduce printing and mailing costs and waste, Hudbay will use the "notice and access" delivery … Lake Production Efficiencies
50%
Implement short-range block model to eliminate waste
100%
3% increase in ore hoisted up the shaft
200%
5% increase
40-F
2023 FY
EX-99
HBM
Hudbay Minerals Inc.
28 Mar 24
Annual report (Canada)
10:08am
, ramps, track haulage drifts, ancillary drifts, pumps, electrical substations, refuge stations, ventilation raises, permanent manways, and ore and waste … and estimates such as estimates of tonnes of waste to be removed over the life of the mining area and economically recoverable reserves extracted
40-F
2023 FY
EX-99.3
HBM
Hudbay Minerals Inc.
28 Mar 24
Annual report (Canada)
10:08am
as waste mined divided by ore mined.
3 Reflects combined mine, mill and general and administrative ("G&A") costs per tonne of ore milled. Reflects … the inclusion of waste rock in the mining cycle and increased gold, copper, and silver grades during the fourth quarter.
Optimization of development drift
40-F
EX-99.1
3s1lyvdz646rq6j2
28 Mar 24
Annual report (Canada)
10:08am
6-K
EX-99.1
yt7kgg
26 Feb 24
Audited Consolidated Financial Statements
11:34am
6-K
EX-99.3
a4m5nh 4ftcju27yshae
26 Feb 24
Audited Consolidated Financial Statements
11:34am
6-K
EX-99.2
rybpizke5u
26 Feb 24
Audited Consolidated Financial Statements
11:34am
6-K
EX-99.1
oiqogqde1jj7g7y9ajv3
6 Dec 23
Current report (foreign)
3:00pm
6-K
EX-99.2
po32a4idwkhrp2d
6 Dec 23
Current report (foreign)
3:00pm
6-K
EX-99.3
3h15 58skpr29dizo
9 Nov 23
Hudbay Announces Third Quarter 2023 Results
3:09pm
6-K
EX-99.1
a6omap42g8v9y
9 Nov 23
Hudbay Announces Third Quarter 2023 Results
3:09pm
6-K
EX-99.2
41xjvonjizawid5vkg
11 Sep 23
Hudbay De-risks Copper World Phase I with Enhanced Pre-Feasibility Study
4:26pm
6-K
EX-99.1
jflfdmmafjoo
11 Sep 23
Hudbay De-risks Copper World Phase I with Enhanced Pre-Feasibility Study
4:26pm
6-K
EX-99.3
zyich1 mp3qcumkgafa
9 Aug 23
Hudbay Announces Second Quarter 2023 Results
1:16pm
6-K
EX-99.1
ucbmdu ljt
9 Aug 23
Hudbay Announces Second Quarter 2023 Results
1:16pm
6-K
EX-99.1
2k4ralrdf oqq
23 Jun 23
Current report (foreign)
10:34am
6-K
EX-99.3
qdq4o14yb0d410amsdet
9 May 23
Hudbay Announces First Quarter 2023 Results
2:01pm
6-K
EX-99.1
em37usduxpw2w5g uc
9 May 23
Hudbay Announces First Quarter 2023 Results
2:01pm